Plant design - Project planning
A variant of our services is the planning and construction of production facilities for PCC (precipitated calcium carbonate) at the customer's site, so-called on-site systems.
![Design, cost calculation and construction supervision of a PCC production plant for 80,000 t/a](../images/home1.jpg)
![Design, cost calculation and construction supervision of a PCC production plant for 80,000 t/a](../images/pcc2.jpg)
![Design, cost calculation and construction supervision of a PCC production plant for 80,000 t/a](../images/pcc3.jpg)
![Design, cost calculation and construction supervision of a PCC production plant for 80,000 t/a](../images/pcc4a.jpg)
![Design, cost calculation and construction supervision of a PCC production plant for 80,000 t/a](../images/pcc5a.jpg)
Design, cost calculation and construction supervision of a PCC production plant for 80,000 t/a
- Building system design and cost calculation
- Planning of the machine installation as well as the office and social rooms
- Design of all containers for production and storage
- Support during the construction phase
- Pipeline construction planning
![Conversion of cellars as general storage and chemical storage](../images/chemikalienkeller1.jpg)
![Conversion of cellars as general storage and chemical storage](../images/chemikalienkeller2.jpg)
![Conversion of cellars as general storage and chemical storage](../images/chemikalienkeller3.jpg)
Conversion of cellars as general storage and chemical storage
- Planning and construction management
- Preparation of the building application, coordination with the responsible building authorities
- Examination of the combined storage, taking into account the current standards and guidelines
- Arrangement with the TÜV (German Association for Technical Inspection) as well as the responsible fire brigade and building authorities
![Planung, Kostenermittlung und Bauüberwachung Kalkmilchanlage für food grade](../images/kalkmilchanlage1.jpg)
![Planung, Kostenermittlung und Bauüberwachung Kalkmilchanlage für food grade](../images/kalkmilchanlage2.jpg)
![Planung, Kostenermittlung und Bauüberwachung Kalkmilchanlage für food grade](../images/kalkmilchanlage3.jpg)
Planning, cost calculation and construction supervision of a food grade lime milk plant
- Design of the building system and calculation of costs
- Planning of the machine installation
- Design of all containers
- Support during the construction phase
- Pipeline construction planning
- Post calculation
![Planning, cost calculation and construction of a pipeline bridge](../images/rohrbruecke1.jpg)
![Planning, cost calculation and construction of a pipeline bridge](../images/rohrbruecke2.jpg)
![Planning, cost calculation and construction of a pipeline bridge](../images/rohrbruecke3a.jpg)
Planning, cost calculation and construction of a pipeline bridge
- Construction of a pipe bridge as connection between production and bagging
![Planning, cost calculation and construction of a loading hall](../images/verladehalle1.jpg)
![Planning, cost calculation and construction of a loading hall](../images/verladehalle2.jpg)
![Planning, cost calculation and construction of a loading hall](../images/verladehalle3.jpg)
Planning, cost calculation and construction of a loading hall
- Determination of ballast for the building complex in stock
- Determination of the storage capacity
- Calculation of costs for the construction of the building
- Expansion of the truck loading area to two loading ramps
- Design of the office, changing room and meeting room
- Construction management and cost control
×